• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.18.2014.tde-15062015-101802
Document
Auteur
Nom complet
Gustavo Coser Monteiro Dias
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Carlos, 2014
Directeur
Jury
Silva, Eraldo Jannone da (Président)
Milan, Marcelo Tadeu
Rodrigues, Alessandro Roger
Titre en portugais
Estudo dos requisitos técnicos para desenvolvimento de uma bancada de teste com barra de pressão Split-Hopkinson
Mots-clés en portugais
SHB
Simulação
Taxa de deformação
Tração rápida
Resumé en portugais
O presente trabalho teve por objetivo o desenvolvimento e aprimoramento da técnica de execução de ensaios mecânicos a altas taxas de deformação (cerca de 1000 a 5000 s-1), por meio do desenvolvimento de um equipamento do tipo Split Hopkinson Bar (SHB), com corpos-de-prova no formato cilíndrico. A construção de tal equipamento fez-se necessária para a obtenção de informações acerca do comportamento dinâmico dos materiais, quando utilizados em condições de impacto, para aplicações de engenharia. Foram definidos os requisitos técnicos para a construção do equipamento SHB para a modalidade de ensaios em tração. Os elementos mecânicos foram projetados, usinados e montados, segundo a configuração de teste adotada. Determinou-se as dimensões e geometrias dos corpos-de-prova, confeccionados em aço ABNT 1020. Realizou-se ainda a instrumentação do equipamento SHB, para a determinação da resposta tensão-deformação dos corpos-de-prova. Adicionalmente, utilizou-se uma câmera de alta velocidade, com capacidade para filmar até 100.000 quadros/s, no intuito de estudar o comportamento do corpo-de-prova durante carregamento dinâmico. Os resultados dos testes realizados indicaram que, apesar da construção mecânica satisfatória do primeiro protótipo, a pressão usada no carregamento (8 kgf/cm²) foi insuficiente para assegurar que a falha do material testado ocorresse durante a propagação do primeiro pulso trativo ao longo do comprimento do corpo-de-prova, que sofreu sucessivos carregamentos até a fratura. Este comportamento é chamado efeito sanfona. Para que o corpo-de-prova se quebrasse após a propagação de apenas um pulso trativo foram sugeridas melhorias na vedação da câmara de gás e o aumento da pressão de trabalho. A utilização de extensômetros de menor grade também foi indicada como melhoria futura. A sincronização entre a câmera de alta velocidade e o sistema de aquisição deverá ser aprimorada, pois é fundamental para a precisão na determinação do instante da colisão entre o projétil e a barra incidente, assim como do instante da ruptura do corpo-de-prova. A continuidade dessa pesquisa, com a busca da solução dos desafios tecnológicos oriundos da construção e teste desse primeiro protótipo, será tema de trabalhos futuros desse grupo de pesquisa.
Titre en anglais
Study of techniques requires for development of the testing bench for split Hopkinson tension bar
Mots-clés en anglais
SHB
Simulation
Strain rate
Stress at speed
Resumé en anglais
The present work consist in the development and improvement of execution technique of mechanical tests at high strain rates (about 1000 to 5000 s-1), with an equipment tensile split Hopkinson bar (SHB) using cylindrical specimen. The construction of such equipment was necessary to obtain information about the dynamic behavior of materials, when used under impact conditions, for engineering applications. Technical requirement are defined for construction of SHB equipment for tensile type tests. The mechanical elements were designed, machined and assembled according to the test configuration adopted. Determined the dimensions and geometries the specimens, made of AISI 1020. Also realized the SHB equipment instrumentation to determine the stress-strain response of specimen. Additionally, used a high speed camera, capable of record up to100,000 frames/s, with the aim of study the behavior of specimen during dynamic loading. The results of tests indicate that despite the satisfactory mechanical structure, of the first prototype, the pressure used in the load (8 kgf/cm²) was insufficient to ensure that the material failure occurred during the propagation of the first tensile pulse along the specimen length, which undergo successive loading until the fracture. This behavior is named concertina effect. For the specimen is broke after propagation of only one tensile pulse, improved in sealing the gas gun and an increase the work pressure, wave been suggested. The use of strain gages smaller grid was also suggested as a future improvement. The synchronization between high speed camera and the system of acquisition should be improved, because it is fundamental to the accuracy in determining the instant collision between the hammer and the incident bar as well as the instant failure of specimen. The continuation of this research, with the pursuit of technological solutions arising from the construction and tests this first prototype will be the subject of future work of this research group.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2015-06-23
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.