Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.18.2019.tde-04042019-103837
Document
Auteur
Nom complet
Paulo Estevão Teixeira Martins
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Carlos, 2019
Directeur
Jury
Oleskovicz, Mário (Président)
Arioli, Fernanda Caseño Trindade
Leão, Fábio Bertequini
Titre en portugais
Alocação otimizada de medidores em sistemas de distribuição visando à redução da múltipla localização de faltas
Mots-clés en portugais
Alocação de medidores
Curtos-circuitos
Otimização linear inteira
Qualidade da energia elétrica
Sistemas de distribuição
Resumé en portugais
Essa pesquisa propõe abordar o problema da alocação de medidores em sistemas de distribuição, de forma a reduzir os custos, garantindo o monitoramento dos distúrbios que afetam a qualidade da energia elétrica, mas também de obter alocações de medidores que facilitem a localização do curto-circuito. O problema de otimização é formulado por meio da programação linear inteira e resolvido por meio de algoritmos adequados para implementar cada modelagem matemática. São considerados sistemas testes com diferentes características, com destaque para a presença de linhas monofásicas e/ou bifásicas, linhas heterogêneas e geradores distribuídos acoplados na rede de distribuição principal. O problema de otimização clássico (reduzir custos garantindo o monitoramento) é retomado e é proposta uma modelagem mais geral, aplicável também a sistemas de distribuição com a presença de ramais monofásicos e/ou bifásicos. A parte da modelagem voltada para o problema da localização de faltas visa à redução das situações de múltipla estimação do local da falta, caracterizadas pela existência de múltiplos pontos no sistema com a mesma distância elétrica até a subestação. Esses dois modelos foram resolvidos separadamente, como dois problemas de otimização mono-objetivo, e em conjunto, sendo portanto, um problema multi-objetivo. As instâncias testadas incluem conjuntos de faltas de todos os tipos, simuladas ao longo das linhas do sistema, considerando a variação da impedância de falta. Os resultados apresentaram soluções de monitoramento para os dois sistemas testes considerados contendo entre 2 e 7 medidores. As soluções alcançadas são atrativas para a concessionária, pois requerem baixo custo de investimento e manutenção dos equipamentos e da infraestrutura de comunicação. A metodologia proposta apresentou alocações dispostas estrategicamente que garantem o monitoramento da qualidade da energia elétrica e minimizam o problema da múltipla estimação da falta, possibilitando o seu uso como suporte a um sistema localizador de faltas.
Titre en anglais
Optimized monitors allocation in distribution systems aiming to reduction of the multiple fault location
Mots-clés en anglais
Distribution systems
Electric faults
Integer linear optimization
Monitors allocation
Power quality
Resumé en anglais
This research proposes to address the monitors allocation problem in distribution systems, aiming to reduce costs, ensuring the monitoring of disturbances affecting the power quality, but also to obtain monitoring systems that facilitate the process of fault location. The optimization problem is formulated through integer linear programming and solved by suitable algorithms for each mathematical modeling. Test systems with different characteristics, emphasis on the presence of single-phase and/or biphasic lines, heterogeneous lines and distributed generators were considered. The classic optimization problem (reduce costs by ensuring disturbance monitoring) is covered and a more general modeling is proposed, also applicable to distribution systems with the presence of single-phase and/or biphasic branches. The process of fault location is supported through the reduction of the multiple estimation of fault location, characterized by the existence of multiple points in the system with the same electrical distance to the substation. These two models were solved separately, as two mono-objective optimization problems, and together, in a multi-objective perspective. The tested instances include sets of faults of all types, simulated along the lines of the system, considering the fault impedance variation. The results presented monitoring solutions for the two test systems considered containing between 2 and 7 meters. The solutions achieved are attractive to the utility, as they require low investment and maintenance costs for equipment and communication infrastructure. The proposed methodology presented allocations strategically placed that guarantee the power quality monitoring and minimize the multiple estimation problem, allowing its use as support to a faults locator system.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Paulo.pdf (2.52 Mbytes)
Date de Publication
2019-04-08
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.