• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Dissertação de Mestrado
DOI
https://doi.org/10.11606/D.18.2016.tde-23082016-141557
Documento
Autor
Nome completo
Pedro Paulo da Silva
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Carlos, 2005
Orientador
Banca examinadora
Moccellin, João Vitor (Presidente)
Camargo Júnior, Alceu Salles
Nagano, Marcelo Seido
Título em português
Métodos heurísticos construtivos para o problema de programação de operações Flow Shop híbrido com estágio de produção dominante
Palavras-chave em português
Estágio dominante
Flow Shop híbrido
Métodos heurísticos
Programação da produção
Setup dependente
Resumo em português
Este trabalho trata o problema multi-estágios de programação da produção em ambientes Flow Shop com máquinas paralelas, apresentando um estágio de produção dominante (máquina única), no qual os tempos de preparação (setup) da máquina são assimétricos e dependentes da seqüência de execução das tarefas. Tal ambiente é constituído de k estágios de produção, com k = {4, 7}, divididos em três etapas assim definidas: na etapa um, o número de estágios de produção pode variar de um até cinco e cada estágio será constituído de m1 máquinas paralelas idênticas , com m1 ∈ {2, 3, 4}, o que determina m1 flow shops paralelos. A etapa dois constitui o estágio dominante d, cuja localização oscila dependendo do número de estágios das etapas um e três. Por ultimo, a etapa três, semelhante à etapa um, possui m2 máquinas paralelas idênticas, onde m2 ∈ {2, 3, 4} e m1 e m2 são gerados aleatoriamente. Todas as tarefas são processadas nas três etapas e o critério de desempenho é a otimização da duração total da programação (makespan) e também a análise do deslocamento do estágio dominante. A programação das tarefas é feita separadamente em cada uma das etapas. Na primeira etapa foi utilizado o método heurístico N&M para cada um dos m1 flow shops paralelos. Para segunda etapa foram desenvolvidos quatro regras e dois métodos heurísticos construtivos com base nos problemas do caixeiro viajante (TSP). Na última etapa, a alocação das tarefas é feita por ordem de chegada na máquina disponível ou com menor carga. Não foram encontrados na literatura trabalhos que retratassem ambientes dessa natureza, logo os métodos desenvolvidos foram comparados entre si. A experimentação computacional analisou os resultados obtidos por meio da porcentagem de sucesso de cada regra, desvio relativo entre os resultados de cada regra, deslocamento da posição do estágio dominante, influência das ordens de grandeza dos tempos de processamento e setup e tempo médio de computação.
Título em inglês
Constructive heuristics methods for hybrid Flow Shop problem with dominant periods of production
Palavras-chave em inglês
Dependent setup
Dominant period
Heuristic methods
Hybrid flow shop
Production scheduling
Resumo em inglês
This dissertation deals with problem multi-periods of production scheduling of the in Flow Shop environment with parallel machines, presenting a period of dominant production (single machine), in which the setup times for the processing of the jobs is asymmetric and sequence dependent on the execution of the jobs. Such environment is constituted by k periods of production, with k = {4, 7} divided in to three stages defined as: First stage: In stage one the number of production periods can vary from one to five, and each period will be constituted of m1 ∈ {2, 3, 4} identical parallel machines, determining m1 parallel flow shops. Stage two - It constitutes the dominant period d, whose localization oscillates between the periods of stages one and three. Finally stage three it is similar to stage one, and has m2 ∈ {2, 3, 4} identical parallel machines, where m1 and m2 Randomly generated. All the jobs are processed in the three stages and the objective is to optimize the total time to complete the scheduling (makespan) and also to analyze the displacement of the dominant period position. The scheduling of the jobs was performed separately in each of the stages. In the first stage the heuristic method N&M was used for each m1 parallel flow shops. In the second stage four constructive rules and two heuristic methods were developed based on traveling salesman problems (TSP). In the last stage the allocation of the jobs was performed according to the arrival time of the available machine or with lesser load. This type of work has not been found in literature; therefore the developed methods were compared among themselves. The statistics used in order to evaluate the heuristic performances were the percentage of success (in finding the best solution), relative deviation and average computational time. The displacement of the dominant period position as well as the influence of the relation of setup-times and processing-times, were also studied. The results of computational experience are discussed.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
Data de Publicação
2016-08-23
 
AVISO: Saiba o que são os trabalhos decorrentes clicando aqui.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.