Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.18.2008.tde-20062008-081005
Document
Auteur
Nom complet
Márcia de Fátima Morais
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Carlos, 2008
Directeur
Jury
Moccellin, João Vitor (Président)
Nagano, Marcelo Seido
Santos, Maristela Oliveira dos
Titre en portugais
Métodos heurísticos construtivos para redução do estoque em processo em ambientes de produção flow shop híbridos com tempos de setup dependentes da seqüência
Mots-clés en portugais
Flow shop híbrido
Métodos heurísticos
Programação da produção
Setup dependente
Resumé en portugais
A teoria de programação da produção preocupa-se em fornecer diretrizes e métodos eficientes para a utilização dos recursos nas atividades produtivas. Este trabalho investiga o problema de programação da produção em ambientes flow shop com máquinas múltiplas e tempos de preparação das máquinas assimétricos e dependentes da seqüência de execução das tarefas. A atividade de programação da produção constitui uma das várias funções executadas pelo planejamento e controle da produção, que tem como objetivo comandar e gerenciar o processo produtivo, e caracteriza uma das atividades mais complexas no gerenciamento dos sistemas produtivos. A programação da produção preocupa-se com a alocação de recursos sobre o tempo para executar um conjunto de tarefas. No ambiente estudado neste trabalho as operações de cada tarefa são executadas em múltiplos estágios de produção, podendo variar a quantidade de máquinas em cada um deles. Cada operação é processada por apenas uma máquina em cada estágio. Os tempos de preparação das máquinas possuem uma variabilidade relevante em função da ordem de execução das tarefas nas mesmas. A função-objetivo considerada é a minimização do tempo médio de fluxo. Foram desenvolvidos quatro métodos heurísticos construtivos com base em algoritmos reportados na literatura para solução do problema flow shop permutacional e máquinas paralelas cujo tempo de setup é dependente da seqüência de execução das tarefas. Como não foram encontrados na literatura métodos de solução para o problema investigado neste trabalho, os algoritmos propostos foram comparados entre si. Foi efetuado um estudo da influência da relação entre as ordens de grandeza dos tempos de processamento das tarefas e do setup das máquinas em cada método de solução. Os resultados obtidos na experimentação computacional foram analisados e discutidos com base na porcentagem de sucesso, desvio relativo, desvio-padrão do desvio relativo e tempo médio de computação.
Titre en anglais
Constructive heuristics methods to minimizing work in process in environment production hybrid flow shop with asymmetric sequence dependent setup times
Mots-clés en anglais
Heuristics
Hybrid flow shop
Production scheduling
Sequence dependent setup time
Resumé en anglais
Scheduling theory attempts to provide guidelines and efficient methods to the use of the resources in the productive activities. This study investigates the hybrid flow shop problem with asymmetric sequence dependent setup times. The activity of production scheduling constitute is one of the several functions carried by production planning and control, which has as the objective command and management the production system, and characterize is one of the tasks most complex in production management. This activity of the scheduling aims within the allocation of the resources for the execution of jobs in a time base. In the environment studied in this work, the operations of each job are processed in multiple production stages. The number of machines in each stage can be different. Each operation is processed by only one machine in each stage. The setup times have a significant variability in function of the sequence of job processing on the machines. The objective is minimizing the mean flow time. Four constructive heuristic methods were proposed on the basis of algorithms reported in the literature for solving permutation flow shop and parallel machine problems with sequence dependent setup times. The proposed heuristic methods will have compared between themselves, since no constructive heuristics have been found in the literature for the scheduling problem considered in this work. It was carried out the study of the influence of the relations among the range of the times processing and setup times in each method. The statistics used in order to evaluate the heuristic performances were the percentage of success (in finding the best solution), relative deviation, standard deviation of relative deviation and average computation time. Results from computational experience are discussed.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2008-06-26
 
AVERTISSEMENT: Le matériau se réfère à des documents provenant de cette thèse ou mémoire. Le contenu de ces documents est la responsabilité de l'auteur de la thèse ou mémoire.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.