Tese de Doutorado
DOI
https://doi.org/10.11606/T.18.2011.tde-05092011-094838
Documento
Autor
Nome completo
Fabio José Ceron Branco
E-mail
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Carlos, 2011
Orientador
Banca examinadora
Nagano, Marcelo Seido (Presidente)
Azzolini Júnior, Walther
Cazarini, Edson Walmir
Oliveira, Marcio Mattos Borges de
Ribeiro, José Francisco Ferreira
Título em português
Um novo método heurístico construtivo de alto desempenho para o problema noidle flow shop
Palavras-chave em português
Makespan
Métodos heurísticos
No-idle
Programação da produção
Programação flow shop permutacional
Resumo em português
Este trabalho é direcionado ao problema de Programação de Operações No-Idle Flow Shop Permutacional. Uma propriedade do problema, oriunda de estudo sobre a sua característica, é apresentada e utilizada para o desenvolvimento de um novo método heurístico construtivo, com o objetivo de minimizar a Duração Total da Programação (makespan). O novo método é comparado com os melhores heurísticos construtivos reportados na literatura, conhecidos por IG, KK e FRB3. Os resultados da experimentação computacional mostraram o melhor desempenho do método proposto, denominado BHBN, para os problemas testes de Ruiz et al. (2008) e Taillard (1993), quanto à qualidade da solução, apresentando também eficiência computacional.
Título em inglês
A new constructive heuristic method for high performance in no-idle flow shop problem
Palavras-chave em inglês
Flow-shop sequencing
Heuristics
Makespan
No-idle
Production scheduling
Resumo em inglês
This work is addressed to the No-Idle Flow Shop Sequencing problem. As a result of an investigation on the problem characteristics it is presented a property of this scheduling problem, which is used for the development of a new constructive heuristic with the objective of minimizing the Total Time to complete the schedule (makespan). The new method is compared with the best constructive heuristics reported in the literature, named IG, KK and FRB3. Results from computational experience showed the best performance of the proposed method, denoted by BHBN, for the instances of Ruiz et al. (2008) and Taillard (1993), as to the quality of the solution, and also computational efficiency.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
Data de Publicação
2011-09-09
 
AVISO: Saiba o que são os trabalhos decorrentes clicando aqui.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.