• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.18.2005.tde-08112005-195241
Document
Auteur
Nom complet
Rubens de Miranda Benini
Adresse Mail
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Carlos, 2005
Directeur
Jury
Mendiondo, Eduardo Mario (Président)
Kobiyama, Masato
Porto, Rodrigo de Melo
Titre en portugais
Cenários de ocupação urbana e seus impactos no ciclo hidrológico na bacia do córrego do Mineirinho
Mots-clés en portugais
campus 2
cenários de planejamento
IPH II
mitigação de enchentes
plano diretor
simulação hidrológica
Resumé en portugais
Este trabalho teve por objetivo principal estabelecer e comparar diferentes cenários de ocupação urbana e seus efeitos no ciclo hidrológico. Buscou-se avaliar os riscos de enchentes à jusante, causados pelo crescimento urbano e aumento das áreas de impermeabilização que ocorrerão com a implantação do novo campus da USP – São Carlos – SP e a conseqüente ocupação da bacia devido à especulação imobiliária. Dessa forma, a bacia do córrego do Alto Mineirinho foi dividida em sub-bacias, utilizando a abordagem de bacias embutidas. Foram estudados 4 cenários de ocupação urbana: cenário pré-urbanização (1972); cenário atual (2000), cenário 2025 com plano diretor (CPD) que inclui recuperação ambiental; e cenário 2025 sem plano diretor (SPD). Foram necessárias aerofotografias para demarcação do uso e ocupação do solo. Além disso, esse trabalho iniciou o monitoramento experimental de parâmetros hidrológicos e ambientais. Para avaliação e comparação dos diferentes cenários realizaram-se simulações hidrológicas com uso do modelo hidrológico IPH II. Com as análises hidrológicas foi possível verificar que a bacia, com apenas 18,6 % de urbanização (2000), apresenta qualidade hídrica inferior à recomendada para os corpos d’água classe 2 (CONAMA 357/05). Em relação às simulações hidrológicas, pôde-se observar que no cenário 2025 SPD, a vazão máxima cresceu 388,0 % quando comparada ao cenário 1972 e 319,4 % quando comparada ao cenário 2000. Entre os cenários 2025 CPD e 2025 SPD há diminuição de 22,3 % na vazão máxima e o aumento no tempo de pico é de 50 minutos. Porém, os riscos de enchente, analisados pelo método de curvas de permanência, mostraram-se que mesmo com aplicação de diretrizes do PD os riscos de inundações continuam altos, o que indica a necessidade de integrar medidas estruturais e medidas não-estruturais para amenizar os efeitos de enchentes à jusante
Titre en anglais
Scenarios of urban occupation and its hydrologic impacts in the Mineirinho river basin
Mots-clés en anglais
campus 2
flood risk reduction
hydrologic simulation
IPH II
master plan
planning scenarios
Resumé en anglais
This work aims to establish and to compare different scenarios of urban occupation and its hydrologic effects. It evaluates downstream flood risks caused from upstream urban growth increased due to impervious areas and housing speculation surrounding the implantation of the new campus of University of Sao Paulo in Sao Carlos city, SP. The Mineirinho river basin was studied through nested sub-basin approach. Four scenarios of urban occupation have been depicted: pre-urbanization (year 1972), current situation (year 2000), prospective scenario with master plan (until year 2025; CPD), and expected situation without master plan (until year 2025; SPD). Aerial photos were used to help on the evolution of land occupation between past and current situation. The comparison of different scenarios was outlined with use of hydrologic model IPH II. Moreover, this work set the monitoring and record of hydrologic time series. Through experimental analyses it was verified that with 18,6 % of urban areas the water quality of sub-basins decreased significantly. Hydrologic modeling simulations showed that maximum streamflow discharges of scenario 2025 SPD would rise up to 388,0 % higher than scenario 1972 and 319,4 % higher than scenario 2000 respectively. Maximum stream discharges and peak timing of scenario with master plan of year 2025 (CPD) would have respectively a reduction of 22,3 % and a increase of 50 minutes in comparison to scenario without master plan of year 2025 (SPD). Permanency curves revealed with the application of master plan guidelines flood risks however continue high, thereby pointing the needs of integrate structural and non-structural measures to cope with floods downstream
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
01capa.pdf (32.43 Kbytes)
02dedicatoria.pdf (43.25 Kbytes)
03sumario.pdf (52.62 Kbytes)
04listas.pdf (100.14 Kbytes)
05introducao.pdf (64.16 Kbytes)
06objetivos.pdf (48.45 Kbytes)
08metodologia.pdf (12.21 Mbytes)
10conclusoes.pdf (59.74 Kbytes)
11recomendacoes.pdf (56.35 Kbytes)
Date de Publication
2005-12-16
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.