Master's Dissertation
DOI
https://doi.org/10.11606/D.18.2007.tde-28032007-134003
Document
Author
Full name
Sulita Mendes Pierotti
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Carlos, 2007
Supervisor
Committee
Povinelli, Jurandyr (President)
Daniel, Luiz Antonio
Kellner, Erich
Title in Portuguese
Avaliação da partida de reator anaeróbio de fluxo ascendente e manta de lodo (UASB), em escala real, sob condições hidráulicas desfavoráveis
Keywords in Portuguese
Digestão de lodo aeróbio
ETE
Partida de UASB
Sobrecarga hidráulica
Abstract in Portuguese
Este estudo teve como objetivo avaliar a partida de reator anaeróbio de fluxo ascendente e manta de lodo (UASB), em escala real, no tratamento de esgoto sanitário, sob condições hidráulicas desfavoráveis. O reator UASB faz parte do sistema de tratamento da ETE Água Vermelha, e é seguido de um biofiltro aerado submerso e de uma unidade de desinfecção por ultravioleta. Foi utilizado metade do volume do reator (117 'M POT.3'), possibilitando menor tempo de detenção hidráulica (TDH). A pesquisa foi dividida em duas fases, uma sem a adição de inóculo (fase I) e outra com inoculação (fase II). Na fase I, foram aplicados vazão de 480 'M POT.3'/dia e carga orgânica volumétrica (COV) de 1,74 kgDQO/'M POT.3'.dia com TDH de 6 horas. Para a fase II, estes valores foram de 600 'M POT.3'/dia, 2,88 kgDQO/'M POT.3'.dia e 5 horas. Os resultados mostraram que as excessivas velocidades ascensionais não permitiram que o reator tivesse desempenho satisfatório. Ocorreu remoção de matéria orgânica e sólidos suspensos apenas na fase II, com exceção dos sólidos suspensos voláteis, que apresentaram remoção nas duas fases. Os lançamentos indevidos de lodo de fossas à que a ETE está submetida, provocaram aumento de sólidos dissolvidos e alcalinidade no efluente. Os leitos de lodo formados nas fases I e II possuíam concentrações semelhantes de sólidos, porém o segundo apresentou maior eficiência de tratamento. Na fase I a remoção de matéria orgânica foi pequena e não ocorreu a formação da manta de lodo. Na fase II ocorreu o provável início da estabilização do processo, aproximadamente 60 dias após a inoculação, a partir de quando a remoção de matéria orgânica dissolvida foi considerada constante e foi observada a formação da manta de lodo. O descarte de 8,5 'M POT.3' de lodo pode ser feito a cada 30 dias.
Title in English
Start-up of a full-scale upflow anaerobic sludge blanket (UASB) reactor, treating domestic sewage, under unfavorable hydraulic conditions
Keywords in English
Aerobic sludge digestion
Hydraulic overload
UASB's start-up
WWTP
Abstract in English
The objective of this study was to evaluate the start-up of a full-scale upflow anaerobic sludge blanket (UASB) reactor, treating domestic sewage, under unfavorable hydraulic conditions. The UASB reactor is part of the wastewater treatment plant of Água Vermelha (São Carlos, SP, Brazil), and it is followed by a submerged aerated biofilter and an ultraviolet radiation disinfection unit. Half of the reactor volume was used (117 'M POT.3'), making it possible to work with a low hydraulic retention time (HRT). The research was divided in two phases, one without reactor seeding (phase I), and another when the reactor was seeded (phase II). At phase I, a flow rate of 480 'M POT.3'/d and a volumetric loading rate of 1,74 kgDQO/'M POT.3'.d were applied, with 6 hours of HRT. At phase II, this values were 600 'M POT.3'/d; 2,88 kgDQO/'M POT.3'd and 5 hours. The results showed that excessive upflow velocities prevented satisfactory performance of the reactor. Removal efficiencies of COD, BOD and TSS were obtained only in phase II, except for VSS, which showed removal in both stages. Unauthorized inputs of septic tanks sludge caused increase in dissolved solids and alkalinity in the effluent. The sludge beds obtained in phases I and II had similar solids concentration; however, the second presented better treatment efficiency. At phase I, organic matter removal efficiency was low and the blanket sludge was not observed. At phase II, the process likely stabilized 60 days after inoculation (operations' day 240). From then on, dissolved organic matter digestion was constant and the sludge blanket was observed. The removal of the excess sludge can be done every other 30 days.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
SulitaPierotti.pdf (3.44 Mbytes)
Publishing Date
2007-04-17
 
WARNING: Learn what derived works are clicking here.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.