• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Dissertação de Mestrado
DOI
https://doi.org/10.11606/D.18.2016.tde-25112016-152749
Documento
Autor
Nome completo
Orlando Kannebley Melotti
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Carlos, 2002
Orientador
Banca examinadora
Porto, Rodrigo de Melo (Presidente)
Bueno, Benedito de Souza
El Debs, Mounir Khalil
Título em português
Tubulações enterradas: "o uso da trincheira induzida"
Palavras-chave em português
Aterro
Condutos
Falsa trincheira
Instalação
Redução de esforços
Trincheira induzida
Tubulações
Resumo em português
Atualmente a otimização e redução de custos verificados na fabricação de tubulações está caminhando para um limite. Toda e qualquer modificação no processo produtivo exige grandes investimentos com retorno a prazos cada vez maiores. Assim, a possibilidade de poder contar com técnicas que permitam a redução de esforços sobre tubulações enterradas traz sem dúvida uma importante contribuição. Este trabalho estuda o uso da trincheira como forma de reduzir os esforços que atuam sobre condutos enterrados, utilizando duas séries de ensaios denominados "A" e "B". Cada série é composta basicamente de quatro combinações diferentes, com variações geométricas da relação de altura relativa (h/B) e largura relativa (b/B). A série B teve a posição relativa (H/B) da camada flexível modificada em relação à série A. Os ensaios realizados no Departamento de Geotecnia da Escola de Engenharia de São Carlos apresentam como resultado uma redução dos esforços da ordem de 44% a 86% em relação ao ensaio de referência montado sem o uso da camada indutora.
Título em inglês
Buried pipes: "the use of induced trench"
Palavras-chave em inglês
Conduits
Embankment
False trench
Induced trench
Instalattion
Pipes
Reduction of efforts
Resumo em inglês
Nowadays the optimization and the reduction of costs verified in the pipes production are walking for a limit. All and whatever modification on the productive process demands great investments with larger time return. Thus, the possibility of taking account with techniques that allows reduction efforts on buried pipes bring without any doubt, an important contribution. This work studies the induced trench to reduce the efforts that act over buried conduits, using two series, "A" and "B", with four treatments each one. The A series is composed with four different combinations. These combinations have geometric variation between relative height (h/B) and relative width (b/B) of flexible layers, were built directly over the trap door. The "B" series is composed with the same geometric flexible layer used in series "A", and they have their relative position (H/B) modified. The treatments were conducted at the "Departamento de Geotecnia" da "Escola de Engenharia de São Carlos". The results obtained were a reduction of the 44 to 86% on the efforts in relation to the reference treatment built without the use of an induced layer.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
Data de Publicação
2016-11-25
 
AVISO: Saiba o que são os trabalhos decorrentes clicando aqui.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.