• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Mémoire de Maîtrise
DOI
https://doi.org/10.11606/D.18.2016.tde-25112016-152749
Document
Auteur
Nom complet
Orlando Kannebley Melotti
Unité de l'USP
Domain de Connaissance
Date de Soutenance
Editeur
São Carlos, 2002
Directeur
Jury
Porto, Rodrigo de Melo (Président)
Bueno, Benedito de Souza
El Debs, Mounir Khalil
Titre en portugais
Tubulações enterradas: "o uso da trincheira induzida"
Mots-clés en portugais
Aterro
Condutos
Falsa trincheira
Instalação
Redução de esforços
Trincheira induzida
Tubulações
Resumé en portugais
Atualmente a otimização e redução de custos verificados na fabricação de tubulações está caminhando para um limite. Toda e qualquer modificação no processo produtivo exige grandes investimentos com retorno a prazos cada vez maiores. Assim, a possibilidade de poder contar com técnicas que permitam a redução de esforços sobre tubulações enterradas traz sem dúvida uma importante contribuição. Este trabalho estuda o uso da trincheira como forma de reduzir os esforços que atuam sobre condutos enterrados, utilizando duas séries de ensaios denominados "A" e "B". Cada série é composta basicamente de quatro combinações diferentes, com variações geométricas da relação de altura relativa (h/B) e largura relativa (b/B). A série B teve a posição relativa (H/B) da camada flexível modificada em relação à série A. Os ensaios realizados no Departamento de Geotecnia da Escola de Engenharia de São Carlos apresentam como resultado uma redução dos esforços da ordem de 44% a 86% em relação ao ensaio de referência montado sem o uso da camada indutora.
Titre en anglais
Buried pipes: "the use of induced trench"
Mots-clés en anglais
Conduits
Embankment
False trench
Induced trench
Instalattion
Pipes
Reduction of efforts
Resumé en anglais
Nowadays the optimization and the reduction of costs verified in the pipes production are walking for a limit. All and whatever modification on the productive process demands great investments with larger time return. Thus, the possibility of taking account with techniques that allows reduction efforts on buried pipes bring without any doubt, an important contribution. This work studies the induced trench to reduce the efforts that act over buried conduits, using two series, "A" and "B", with four treatments each one. The A series is composed with four different combinations. These combinations have geometric variation between relative height (h/B) and relative width (b/B) of flexible layers, were built directly over the trap door. The "B" series is composed with the same geometric flexible layer used in series "A", and they have their relative position (H/B) modified. The treatments were conducted at the "Departamento de Geotecnia" da "Escola de Engenharia de São Carlos". The results obtained were a reduction of the 44 to 86% on the efforts in relation to the reference treatment built without the use of an induced layer.
 
AVERTISSEMENT - Regarde ce document est soumise à votre acceptation des conditions d'utilisation suivantes:
Ce document est uniquement à des fins privées pour la recherche et l'enseignement. Reproduction à des fins commerciales est interdite. Cette droits couvrent l'ensemble des données sur ce document ainsi que son contenu. Toute utilisation ou de copie de ce document, en totalité ou en partie, doit inclure le nom de l'auteur.
Date de Publication
2016-11-25
 
AVERTISSEMENT: Apprenez ce que sont des œvres dérivées cliquant ici.
Tous droits de la thèse/dissertation appartiennent aux auteurs
CeTI-SC/STI
Bibliothèque Numérique de Thèses et Mémoires de l'USP. Copyright © 2001-2024. Tous droits réservés.