• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Master's Dissertation
DOI
https://doi.org/10.11606/D.18.2011.tde-11052011-092844
Document
Author
Full name
Rafael Brito de Moura
E-mail
Institute/School/College
Knowledge Area
Date of Defense
Published
São Carlos, 2011
Supervisor
Committee
Foresti, Eugenio (President)
Damianovic, Márcia Helena Rissato Zamariolli
Piveli, Roque Passos
Title in Portuguese
Desempenho de um reator vertical de fluxo contínuo e leito estruturado com recirculação do efluente, submetido à aeração intermitente, na remoção de carbono e nitrogênio de um efluente sintético
Keywords in Portuguese
Aeração intermitente
Espuma de poliuretano
Leito estruturado
Remoção simultânea de carbono e nitrogênio
Abstract in Portuguese
Essa pesquisa teve como objetivo principal avaliar o desempenho de um reator de leito estruturado e fluxo contínuo, sob diferentes condições operacionais como aeração intermitente e recirculação do efluente, na remoção biológica de carbono e nitrogênio de uma água residuária sintética. Foi utilizado um reator vertical, construído em acrílico, com um volume total de 11,6 L e um volume útil de 6,1 L. O meio suporte utilizado para fixação dos microrganismos foi espuma de poliuretano na forma de cilindros dispostos verticalmente suportados por hastes, presos nas extremidades. A razão de recirculação utilizada durante todo o experimento foi igual a 5. Os períodos adotados de aeração e não aeração foram de 2 horas e 1 hora, respectivamente. Estabelecidos a vazão de recirculação e os períodos de aeração e não aeração, estudou-se o efeito da variação do TDH na eficiência de remoção de 'N'-total e DQO. Como resultado, observou-se que a melhor condição operacional foi com TDH de 12 horas, que apresentou eficiência de remoção de 'N'-total de 82% e remoção de DQO de 89%. O sistema mostrou-se estável ao ser operado nessas condições, apresentando pouca variação nos resultados. Por outro lado, quando o sistema foi operado com TDH de 8 horas e 10 horas, houve queda nas eficiências de remoção de 'N'-total para valores de 49% e 45% respectivamente. Com relação à remoção de DQO, as eficiências com TDH de 8 horas e 10 horas foram de 85% e 88% respectivamente, indicando uma boa remoção de matéria orgânica mesmo com TDH menor. Não houve presença significativa de biomassa no efluente, indicando que a biomassa permaneceu fortemente aderida ao meio suporte. Foram realizados ensaios cinéticos para determinação das velocidades de nitrificação e desnitrificação da biomassa do reator operando em sua melhor condição operacional. Por meio e perfis temporais em reatores em batelada, obteve-se uma velocidade de nitrificação via 'N'-amoniacal de 1,43 mg'N'/gSSV.h. As velocidades de nitrificação via 'N'-nitrito foram 1,87 mg'N'/gSSV.h e 1,3 mg'N'/gSSV.h. Na desnitrificação de 'N'-nitrato à 'N'-nitrito, foram obtidas velocidades de 3,4 mg'N'/gSSV.h e 4,0 mg'N'/gSSV.h. Para a desnitrificação de 'N'-nitrito a 'N IND.2', as velocidades obtidas foram 2,3 mg'N'/gSSV.h e 2,9 mg'N'/gSSV.h.
Title in English
Performance of vertical reactor of continuous flow and bed structured with recirculation, submitted to intermittent aeration for the removal of carbon and nitrogen from a synthetic effluent
Keywords in English
Intermittent aeration
Polyurethane foam
Simultaneous removal of carbon and nitrogen
Structured bed
Abstract in English
This research aimed at evaluating the performance of a structured bed reactor continuously fed, operated with intermittent aeration and effluent recirculation, in the biological removal of carbon and nitrogen from a synthetic effluent. A vertical reactor was built in acrylic, with a total volume of 11.6 L and a working volume of 6.1 L. Polyurethane foam cylinders supported by sticks vertically disposed were used for biomass attachment. The recirculation flow rate was 5. Aerated and non-aerated periods ware 2 hours and 1 hour, respectively. Once established the recirculation flow and the length of aerated and non-aerated period, the study of effect of the hydraulic retention time (HRT) on the removal efficiencies of Total-'N' and COD was started. The best operating condition was achieved with HDT of 12 hours, with removal efficiency of Total-'N' and COD removal of 82% of 89% respectively. Under such condition, the system exhibited high stability with little variation of the monitoring parameters. On the other hand, when the system was operated with HDT of 8 hours and 10 hours, there was a decrease in removal efficiencies of Total-'N', to 49% and 45% respectively. Regarding COD removal, the efficiencies at HDT of 8 hours and 10 hours were 85% and 88% respectively, indicating that organic matter removal efficiency is not limited in such range of HDT. The low concentration of suspended solids in the effluent indicates the biomass was firmly attached to the bed. Kinetic assays were performed to determine the rates of nitrification and denitrification in the reactor operating at its best operational condition. Temporal profiles obtained from batch reactors allowed for obtaining an ammonia oxidation rate of 1.43 mg'N'/gVSS.h. The nitrite oxidation rates were 1.87 mg'N'/gVSS.h and 1.3 mg'N'/gVSS.h. The reduction rates of nitrate to nitrite were 3.4 mg'N'/gVSS.h and 4.0 mg'N'/gSSV.h. The denitrification rate of nitrite to 'N IND.2' were 2.3 mg'N'/gSSV.h and 2.9 mg'N'/gSSV.h.
 
WARNING - Viewing this document is conditioned on your acceptance of the following terms of use:
This document is only for private use for research and teaching activities. Reproduction for commercial use is forbidden. This rights cover the whole data about this document as well as its contents. Any uses or copies of this document in whole or in part must include the author's name.
Moura_RafaelBrito.pdf (2.58 Mbytes)
Publishing Date
2011-05-13
 
WARNING: The material described below relates to works resulting from this thesis or dissertation. The contents of these works are the author's responsibility.
  • MOURA, Rafael B., DAMIANOVIC, Márcia H.R.Z., and FORESTI, Eugenio. Nitrogen and carbon removal from synthetic wastewater in a vertical structured-bed reactor under intermittent aeration [doi:10.1016/j.jenvman.2012.01.009]. Journal of Environmental Management [online], 2012, vol. 98, p. 163-167.
All rights of the thesis/dissertation are from the authors
CeTI-SC/STI
Digital Library of Theses and Dissertations of USP. Copyright © 2001-2024. All rights reserved.