• JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
  • JoomlaWorks Simple Image Rotator
 
  Bookmark and Share
 
 
Dissertação de Mestrado
DOI
https://doi.org/10.11606/D.18.2018.tde-09042018-104115
Documento
Autor
Nome completo
Jose Thomaz Mendes Filho
Unidade da USP
Área do Conhecimento
Data de Defesa
Imprenta
São Carlos, 1995
Orientador
Banca examinadora
Kawamoto, Eiji (Presidente)
Sanches, Suely da Penha
Silva, Antonio Nelson Rodrigues da
Título em português
Utilização do modelo de insumo-produto de Leontief para determinação de alguns benefícios indiretos resultantes da construção e da manutenção de obras de infra-estrutura de transporte
Palavras-chave em português
Benefícios indiretos - determinação
Modelo de insumo-produto - aplicação
Resumo em português
Neste trabalho, utiliza-se o modelo de insumo-produto de Leontief, em sua variante nacional, estática e aberta, para quantificar alguns benefícios indiretos gerados por um investimento em construção e manutenção de obras de infra-estrutura de transporte. Estes benefícios são conseqüência do aumento da produção gerado pelo investimento, uma vez que há uma parcela de produção de qualquer bem ou serviço que corresponde a um aumento de riqueza para a região receptora do investimento. Procura-se mostrar que esse aumento de riqueza deve ser considerado como um beneficio indireto adicional, e que a busca da identificação da magnitude desse valor adicionado à economia pode fazer a diferença entre múltiplas alternativas de investimento. Sugere-se que o resultado dessa quantificação possa fazer parte de métodos mais flexíveis de avaliação como os métodos multi-objetivos e multi-critérios.
Título em inglês
Using Leontief's input-output model to measure some indirect benefits generated as a consequence of investiment in construction and maintenance of transportation infrastructure facilities
Palavras-chave em inglês
Indirect benefits - measurement
Input-output model - uses
Resumo em inglês
At this work, the national static open Leontief's input-output model is used in order to measure some indirect benefits generated as a consequence of investment in construction and maintenance of transportation infrastructure facilities. These benefits are generated by an increase in production, once there is always a part of the production of goods and services which implies on a growth of wealth for the region into which the investment is applied. It is shown that this increase of wealth has to be taken in to account as an additional indirect benefit, and that searching for identification of the magnitude of that value added into the economy could make the difference among several investment alternatives. It is suggested that the results of that measurement could be considered in more flexible evaluation methods, such as multi-objectives and multi-criteria methods.
 
AVISO - A consulta a este documento fica condicionada na aceitação das seguintes condições de uso:
Este trabalho é somente para uso privado de atividades de pesquisa e ensino. Não é autorizada sua reprodução para quaisquer fins lucrativos. Esta reserva de direitos abrange a todos os dados do documento bem como seu conteúdo. Na utilização ou citação de partes do documento é obrigatório mencionar nome da pessoa autora do trabalho.
Data de Publicação
2018-04-09
 
AVISO: Saiba o que são os trabalhos decorrentes clicando aqui.
Todos os direitos da tese/dissertação são de seus autores
CeTI-SC/STI
Biblioteca Digital de Teses e Dissertações da USP. Copyright © 2001-2024. Todos os direitos reservados.