Disertación de Maestría
DOI
https://doi.org/10.11606/D.18.2017.tde-29052017-133744
Documento
Autor
Nombre completo
Renato Mendes da Silva
Instituto/Escuela/Facultad
Área de Conocimiento
Fecha de Defensa
Publicación
São Carlos, 2003
Director
Tribunal
Carneiro, Adriano Alber de França Mendes (Presidente)
Chaves, José Roberto de Andrade
Costa, Geraldo Roberto Martins da
Título en portugués
Avaliação da operação otimizada de usinas hidrelétricas
Palabras clave en portugués
Operação otimizada
Planejamento da operação
Sistemas hidrotérmicos de potência
Resumen en portugués
Através da análise de estudos de otimização e simulação, considerando a operação energética das usinas existentes na cascata do rio Paranapanema, situada na região sudoeste do estado de São Paulo, mostrou-se que a operação do sistema, baseada em regras de operação obtidas através da otimização da cascata, resulta em ganhos significativos de geração e de energia armazenada, proporcionando, desse modo, uma melhor utilização de recursos hidrológicos, bem como uma condição final de armazenamento mais favorável, implicando uma operação mais eficiente e confiável de todo o sistema.
Título en inglés
Evaluation of the optimized operation of hydroelectric power plants
Palabras clave en inglés
Hydrothermal power systems
Operation planning
Optimized operation
Resumen en inglés
Through the analysis of optimization and simulation studies regarding the energy operation of the existing plants in the Paranapanema river, situated in the southwestern region of the state of São Paulo, Brazil, it was shown that the system operation, based on operation rules achieved considering the cascate optimization, yields significant gains of generation and stored energy in the system, therefore providing a better use of the available hydrologic resources, as well as a more favorable final storage level for each plant, which implies in a more efficient and reliable operation of the whole set.
 
ADVERTENCIA - La consulta de este documento queda condicionada a la aceptación de las siguientes condiciones de uso:
Este documento es únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro. Esta reserva de derechos afecta tanto los datos del documento como a sus contenidos. En la utilización o cita de partes del documento es obligado indicar el nombre de la persona autora.
Fecha de Publicación
2017-05-29
 
ADVERTENCIA: Aprenda que son los trabajos derivados haciendo clic aquí.
Todos los derechos de la tesis/disertación pertenecen a los autores
CeTI-SC/STI
Biblioteca Digital de Tesis y Disertaciones de la USP. Copyright © 2001-2024. Todos los derechos reservados.